Wednesday, August 08, 2007

Analysis starts

Assisted by En Talip, the experiment on my centrifugal pump was started. The pump was running well, the interfaces between PC and the pump were checked. Some loosenes was found at the termination box and fixed by Mr Talip. A big problem was occured due to undetected PCI card and finally solved by myself. The PCI card was removed and repluged in and that was a good idea... After all those things were confimed in the good condition, the online condition monitoring was working. Thanks god....

Tuesday, August 07, 2007

Last Check

All done...My pump was succesfully running after its priming directly connected to the water supply through the rubber hose.The flow rate meter is functioning well after two lithium battery 3 v changed and 640.0 ( meter cubic per sec or gallon per min) shown. Pressure gauges are ok as well. Tomorror will be a meeting with En Talip and maybe the data starts to be collected( hopefully).

Sunday, August 05, 2007

Boring Day

Nothing much interesting today except thinking, playing games, surfing...